The opening of London Museum on 28 November 2026 marks a new chapter for Smithfield’s historic General Market. Its free permanent galleries explore the city and the lives of its people, within a building that has its own history to share.
Tyréns AKT’s structural, civil and bioclimatic teams have supported the client and architects from day one. Working alongside Stanton Williams, Asif Khan and Julian Harrap Architects, we have helped realise their vision for a world-class museum while protecting the craft and character of its historic home.


Across the Victorian General Market and 1960s Poultry Market, our work has ranged from targeted repairs and structural adaptations to strengthening around the operational Thameslink railway. More than 70% of the existing building fabric is retained, complemented by salvaged materials and innovative lower-carbon concrete.
Our bioclimatic specialists also worked with BRE to combine existing wind tunnel data with thermal comfort modelling, supporting planning while avoiding a new wind study and saving time and resources.


“Working on the London Museum at Smithfield has been a once-in-a-lifetime privilege. I am immensely proud of what we have achieved together, through the dedication, passion and collective expertise of so many people across Tyréns AKT and the wider project team. To have played a part in transforming these extraordinary historic buildings and giving something truly special back to London, for generations to come, is an achievement we can all be proud of.”
The General Market opening marks the museum’s first phase, with the Poultry Market scheduled to follow in 2028. Together, they show how a shared vision and creative reuse can preserve a city’s heritage while making room for its future.
Congratulations to everyone who has helped bring this transformation to life.
Project team:
London Museum | Stanton Williams | Asif Khan | Julian Harrap Architects | Arup | Sir Robert McAlpine | Gardiner & Theobald | Newmark (Gerald Eve) | Momentum | Buro Four | Plan A
